Zoji La (Zojila Pass): Open or Closed, Height, Tunnel and the Rules (2026-27)
Zoji La is the 3,528 m pass on the Srinagar to Leh highway, about 23 km beyond Sonamarg. It was open on 3 October 2026, with light vehicles allowed to leave Sonamarg until 1 pm. It no longer shuts for the whole winter, but closes for days after heavy snow. The 13 km Zojila tunnel is due in February 2028.
- Altitude
- 3,528 m (11,575 ft)
- Status on 3 Oct 2026
- Open; cars leave Sonamarg by 1 pm
- From Sonamarg
- About 23 km
- Winter
- No fixed closure now; shuts after heavy snow
- Zojila tunnel
- 13.15 km; due February 2028
- Union taxi to Zero Point
- ₹4,000 – ₹4,500 per vehicle, with a one-hour halt: ₹4,000 for a Sumo or Tavera, ₹4,500 for an Innova
- Road status
- Traffic Control Unit: 0194-2450022

Zoji La is the pass that joins Kashmir to Ladakh: the first and lowest of the three passes on the road from Srinagar to Leh, and by reputation the worst. For most visitors to Kashmir it is a half-day outing from Sonamarg to the snow. For Ladakh it is the lifeline. This guide covers the pass itself: whether it is open, the rules on the road, the tunnel being built beneath it, and what happened here in 1948. The rest of the valley is in our Sonamarg guide.
Is Zoji La open today?
It was open when we checked. The J&K Traffic Police plan released on 3 October 2026 allows light vehicles both ways on the Srinagar, Sonamarg, Gumri road, "subject to fair weather and good road conditions". We found no closure of the pass this autumn; the last was overnight on 13 August 2026, after a cloudburst.
The pass can shut within hours, so check on the day. The traffic police publish a plan every evening at trafficpolice.jk.gov.in, and these are the numbers it gives.
| Office | Numbers |
|---|---|
| Traffic Control Unit, Srinagar | 0194-2450022, 0194-2485396, 1800-180-7091, 103 |
| Police Control Room, Kargil | 9541902330, 9541902331 |
Where is Zoji La, and how high is it?
On National Highway 1, between Sonamarg in Kashmir's Ganderbal district and Drass in Ladakh. It is the divide between the green Kashmir valley and the dry valleys of Drass and Suru. "La" already means pass, so "Zojila Pass" says it twice.
| Figure | Source | |
|---|---|---|
| Altitude, most cited | 3,528 m (11,575 ft) | All India Radio; road guides |
| Altitude, other official figure | 3,567 m | Kargil district website |
| From Sonamarg | About 23 km to the top; Zero Point is 1 to 2 km beyond | Road guides; the taxi union lists Zero Point as 54 km return |
| From Srinagar | About 100 km | Road guides |
| Sonamarg to Drass | 65 km | Road guides |
| Kargil | 205 km from Srinagar, 230 km from Leh | Kargil district website |
| Srinagar to Leh | 434 km | All India Radio |
Some pages, Wikipedia among them, put the pass 15 km from Sonamarg. That cannot be squared with Zero Point, just past the top, being about 27 km out.
Which pass connects Srinagar to Leh?
Zoji La is the one that matters, because it is the one that closes. The highway crosses three passes on the way to Leh.
| Pass | Altitude | Where |
|---|---|---|
| Zoji La | 3,528 m | Between Sonamarg and Drass |
| Namika La | 3,815 m | Between Kargil and Leh |
| Fotu La | 4,108 m | Between Kargil and Leh; the highest |
The Border Roads Organisation keeps the road open from both ends. Its Project Beacon clears snow from the Sonamarg side up to Zero Point, and Project Vijayak, based in Kargil, works from the Drass side.
When does Zoji La open and close?
"Open from May to October" is what most guides still say. It is out of date. The winter closure has shrunk from five months a decade ago to about a month, and in the winter of 2025-26 the pass had no seasonal closure at all.
| Winter | Closed | Reopened | How long |
|---|---|---|---|
| 2023-24 | 15 February 2024 | 20 March 2024 | 35 days, a record then |
| 2024-25 | 27 February 2025 | 1 April 2025 | 32 days |
| 2025-26 | No seasonal closure | Short closures after each heavy fall | First time open beyond 28 February |
"No seasonal closure" does not mean open every day. In 2025-26 the road shut for four days to 2 January, from about 22 to 31 January, for six days to 15 March, from 19 to 23 March, after the avalanche of 27 March, and again from 25 April. Two-way traffic resumed only in mid-May 2026.
- First snow: the higher slopes had their first snowfall of this season on 5 September 2026. Last year the first road closure for snow was on 4 November.
- Fridays: older guides say the pass shuts on Fridays for maintenance. The official plan we read does not mention it.
The rules on the road
Traffic over the pass is regulated every day, under an order of the Divisional Commissioner of Kashmir dated 14 May 2026. As of the plan for 4 October 2026:
- Cars and other light vehicles: may leave Sonamarg for Kargil, and Minamarg for Srinagar, only until 1 pm, after the road agencies give the green signal.
- Trucks and buses: from Sonamarg towards Kargil between noon and 5 pm. Nothing moves after 5 pm.
- Chains: motorists are advised to carry and use anti-skid chains.
- In snow season: the May 2026 order asks for chains, preferably four-wheel drive, experienced drivers and escorted convoys.
The timings change with the season and the weather. In March 2026 traffic was allowed only after 8 am; in early season the road has run one way on alternate days.
The Zojila tunnel
A tunnel under the pass will make all of this history. It is 13.15 km long, from Baltal on the Kashmir side to Minamarg on the Ladakh side, and is being built by Megha Engineering for the national highways corporation. The final breakthrough was on 9 June 2026.
| Length | 13.15 km, with 17 km of approach roads |
|---|---|
| Cost | ₹6,809.69 crore |
| Work began | October 2020 |
| Breakthrough | 9 June 2026 |
| Completion, as last stated officially | February 2028 |
| What it changes | A crossing of two to three and a half hours becomes about 20 minutes, in every season |
Breakthrough is not opening: the lining, ventilation and safety systems are still to be done. Its smaller sibling, the Sonamarg tunnel, opened on 13 January 2025 and is the reason Sonamarg itself can now be reached all winter.
Visiting Zoji La from Sonamarg
Tourists do not usually drive the pass themselves. The trip is sold at the Sonamarg taxi stand as Zero Point: up the pass by union taxi, an hour at the snow, and back.
| Item | Price | How we know |
|---|---|---|
| Sonamarg union taxi to Zero Point, return | ₹4,000 – ₹4,500per vehicle, with a one-hour halt: ₹4,000 for a Sumo or Tavera, ₹4,500 for an Innova · Typical paidReported online, 20 Aug 2026 | Reported online, 20 Aug 2026A printed Sonamarg rate card with the J&K Tourism and Sonamarg Development Authority logos gives ₹4,000 per cab (photo published March 2026; the stand's board said the same in June 2024). Agency copies of the 2026 list give ₹4,500 for an Innova (TravelMyKashmir, 20 August 2026) |
| Sonamarg union taxi to Zero Point, return, small car or van | ₹2,400 – ₹2,700per vehicle: van, Eeco or Etios · Typical paidReported online, 20 Aug 2026 | Reported online, 20 Aug 2026Agency copies of the Sonamarg union list (TravelMyKashmir, updated 20 August 2026); the same figures appear on the union's own 2023 list |
| Sonamarg union taxi, waiting beyond the first hour | ₹300per extra hour · Fixed rateReported online, 13 Nov 2023 | Reported online, 13 Nov 2023Sonamarg Taxi Sumo Owners Union website (November 2023): one hour of halt at a spot, then ₹300 an hour |
- On the way up: the first 10 km are on good road. Then the tarmac breaks up, with streams across it, until just past the top. You look down on Baltal, the base camp for the Amarnath pilgrimage.
- At the top: a Border Roads sign reading "I Love Zojila" has become the photo stop, with tea stalls nearby.
- Zero Point: the snow stop, 1 to 2 km beyond the top.
- The war memorial: at Gumri, about a kilometre past Zero Point.
- Beyond: the road is excellent from Zero Point to Drass, 65 km from Sonamarg, with its Kargil War Memorial.
Fares, the 1 pm rule, and the court ban on snow rides are in our Zero Point guide. The walk-up alternative from Sonamarg is Thajiwas Glacier.
The battle of 1948: tanks at 11,575 feet
Zoji La is a battlefield. In 1948 the pass was seized by Gilgit rebels and Pakistani forces in their push for Ladakh. Two Indian assaults in September failed.
The third, Operation Bison, did not. Stuart light tanks of the 7th Cavalry were brought up with their turrets removed and under cover, while the Madras Sappers turned the mule track from Baltal up to Gumri into one that vehicles could climb. On 1 November 1948 the tanks forced the pass. It was the highest altitude at which tanks had fought anywhere in the world at that time. Drass fell two weeks later, and the link to Kargil was made by 24 November.
The Army marks 1 November as Zoji La Day at the war memorial at Gumri. The 77th was observed in 2025.
Is Zoji La dangerous?
It deserves respect. The road is cut into steep slopes, it carries heavy trucks, and in snow season it is prone to avalanches.
| Date | What happened |
|---|---|
| 26 August 2025 | Landslides after heavy rain closed the highway |
| 6 September 2025 | Landslides at several points on the Zojila stretch |
| 27 March 2026 | Avalanches between Zero Point and Minamarg buried at least 15 vehicles; seven people died |
| 25 April 2026 | An avalanche at Shaitan Nallah pushed two tankers off the road; no deaths |
| 29 May 2026 | A trailer fell into a gorge; the driver and helper survived |
| 13 August 2026 | A cloudburst and mudslide closed the road overnight |
| 2 October 2026 | A truck rolled into a gorge; the driver was unhurt |
Tourist vehicles have been stopped outright before. After two fatal accidents in December 2023, the authorities barred them beyond Sonamarg until further orders.
What the authorities advise
- Confirm the road status with the Traffic Control Unit before you leave
- Carry anti-skid chains
- Do not set off after the cut-off time
- Obey avalanche warnings: both avalanches of 2026 came in spring, not midwinter
- Do not stay long at the top: it is about 3,500 m, against 2,730 m at Sonamarg
- Take your rubbish down: plastic is banned on the pass
Best months to go
| Months | What to expect |
|---|---|
| April | Snow walls beside the road, one-way traffic, frequent closures and avalanche risk |
| May and June | The busiest months, with traffic jams on the pass; snow at Zero Point, thinning through June |
| July and August | Rain, landslides and the worst road surface; the Amarnath Yatra crowds Baltal |
| September to mid-October | Clear and quiet; the first fresh snow on the peaks |
| Late October to March | Snow can close the road on any day; open only by the day's advisory |
What does Zoji La mean?
A defence spokesperson has called it "the mountain pass of blizzards", the meaning given in local folklore. Another account derives it from Du-Zhi-la, the goddess of the four seasons, who in legend turned her back on Ladakh and her face to Kashmir, which is why one is dry and the other green.
Frequently asked questions
Is Zojila Pass open today?
It was open on 3 October 2026 under the traffic police plan, with light vehicles leaving Sonamarg until 1 pm. It can close within hours for snow, landslides or avalanches, so check the daily plan or call the Traffic Control Unit on 0194-2450022.
Which pass connects Srinagar to Leh?
Zoji La, at 3,528 m, between Sonamarg and Drass. The highway then crosses Namika La and Fotu La between Kargil and Leh.
What is the height of Zojila Pass?
3,528 m, or 11,575 ft, is the figure most often given. The Kargil district website says 3,567 m.
How far is Zojila Pass from Sonamarg?
About 23 km to the top of the pass. Zero Point, where tourist taxis stop, is 1 to 2 km beyond it, about 27 km from Sonamarg.
When will the Zojila tunnel open?
February 2028 is the date last stated officially. The 13.15 km tunnel had its final breakthrough on 9 June 2026; the lining and safety systems remain.
Is Zojila Pass open in winter?
Sometimes. In the winter of 2025-26 it had no seasonal closure for the first time, but shut for days after each heavy snowfall. In earlier years it closed for about a month, in February and March.
Can I drive my own car over Zoji La?
Through traffic to Kargil and Leh crosses the pass in private cars under the daily traffic plan. For sightseeing from Sonamarg, operators say you must hire a Sonamarg union taxi; we found no official order on it.
Do I need a permit for Zoji La?
No. Road guides say no permit is needed for the pass or for the Srinagar to Leh highway.
Is Zojila Pass dangerous?
It is a narrow, broken road on steep slopes, with heavy trucks, landslides in the rains and avalanches in spring. Seven people died in an avalanche there on 27 March 2026. Go in clear weather, in the morning.
What happened at Zoji La in 1948?
Indian tanks of the 7th Cavalry forced the pass on 1 November 1948 in Operation Bison, the highest tank action in the world at the time. It opened the way to Drass and Kargil.
Founder, EverythingKashmir
Founder of EverythingKashmir and a design studio in Bangalore. Lives in Mumbai. Every guide is checked on the ground by family in Kashmir, with roots in Kashmiri arts, clothing and travel.
More in Sonamarg Guide
Where to next
Planning a Kashmir trip?
Tell us your dates and budget. A local replies with an honest plan.